RPM Installations approached us to assist with the replacement of a chiller pump at Thistle Hotel Marble Arch. Given the nature of the site, the work required careful coordination and precision to deliver a seamless upgrade.

20220623_124519.jpg
Thistle Hotel Marble Arch needed a reliable chiller system to maintain guest comfort. The issue they were facing was that the existing pump was nearing the end of its life, and posing a risk of failure. Replacing the unit came with logistical challenges, including tight access via a spiral staircase and the presence of asbestos on the flanges, which required specialist handling.
Our team isolated and removed the old system, carefully installing new valves and spools before refilling the system. We then replaced the dilapidated pump with a Grundfos single-stage, centrifugal in-line pump. This model was selected for its efficiency and durability. To install the new unit, we modified the pipework, before carrying out our testing and commissioning of the system to ensure full functionality.
IMG_9606.JPEG
SAM_2745.JPG
With the new pump successfully installed, Thistle Marble Arch now benefits from improved reliability. The upgrade not only mitigates the risk of unexpected failure but also enhances system performance, ensuring guests and staff experience uninterrupted comfort. Our client at RPM Installations said: "Deckpro carried these works in an efficient and professional manner, this is something that we have grown to expect when working with Deckpro. They were also extremely flexible and accommodating when it came to the challenges that were presented involving asbestos and working along side the asbestos removal team to see this through to completion. 

Subscribe to our newsletter

Operations Manager, RPM Installations: 

"deckpro carried out these works in an efficient and professional manner, this is something that we have grown to expect when working with deckpro."

View more case studies

Teardrops_edited.jpg

Case Study

Alexandra Security

Upgrading a wastewater pump and installation of a 3000L tank to prevent persistent flooding issues at site. 

Holiday Inn Brighton (cold water tank) (4).jpg

Case Study

Holiday Inn, Brighton

Upgrading systems with minimal disruption: we installed a new cold water storage tank without any downtime disruption.

Hospital Employees

Case Study

London Hospital

Critical heating upgrade: Installed a new dual pump for an aging system serving a London hospital's maternity ward and main block.