Holiday Inn, Brighton
deckpro pumps was commissioned by our client at RPM Installations to upgrade the pump system at the Holiday Inn in Brighton. This involved installing a new 2250-litre cold water storage tank and a three-phase variable speed booster set. It was essential that the installation was carried out with minimal disruption to hotel guests.
The client wanted to upgrade their existing system and their primary concern was for the project to be completed, while minimising disruption to guests and maintaining operational efficiency.
deckpro pumps and RPM Installations devised a comprehensive plan that involved removing existing equipment, modifying pipework, and installing the new tank and booster set.
Despite facing spatial constraints, our undeterred engineers overcame the challenge of installing the new pump by removing several bricks from a restricting wall. This ensured the seamless integration of the new system without impeding the scheduled works.
We were able to complete the entire project during normal working hours (including the change over of the water supply) and the work was completed with no disruption to hotel guests or to the residents in the private apartments above the hotel. Our client was delighted with the outcome, commenting on the 'smooth implementation' of the project, which has resulted in improved efficiency and reliability of the building's operations.