Our client reached out to us regarding a critical failure at Chelsea and Westminster Hospital, where essential plant equipment was on the brink of shutdown. Given the nature of the site, it was essential for our team to provide a fast and effective solution to restore full functionality and prevent any disruption to its operations.

Chelsea & Westminster Hospital Website Images.png
The client, James Eddy, contacted us with an urgent request as Chelsea and Westminster Hospital's critical plant equipment was on the verge of failure. The hospital, a critical site for patient care, could not afford extended downtime. Upon investigation, we discovered that the initial issue with the inverter was actually caused by a failing, outdated pump. Given the critical nature of the site and the risk to hospital operations, an immediate and reliable solution was needed to prevent further disruption.
After discussions with James and a thorough investigation, it became clear that replacing the failing pump was essential. We recommended a high-performance, robust pump suited to the hospital’s operational needs, along with an upgraded inverter. This solution not only restored functionality but also enhanced the system’s efficiency and reliability, ensuring the Hospital had a robust system to support their critical operations.
Chelsea & Westminster Hospital Website Images (1).png
Chelsea & Westminster Hospital Website Images (2).png
The system was restored to full functionality, with both the primary and secondary pumps operating as intended. The newly installed pump, designed for reliability, ensures the hospital’s critical plant equipment can function without disruption. Our rapid response and tailored solution allowed the hospital to maintain its vital services without prolonged downtime, providing peace of mind to the client. We delivered exactly what they needed—quick, effective answers and a robust solution—ensuring the hospital's operations remained uninterrupted.

Subscribe to our newsletter

What Our Clients Say

“deckpro have been a valuable addition to our preferred contractors list, surveys are carried out very quickly and works completed to a high standard, excellent service. We highly recommend deckpro” 

View more case studies

Teardrops_edited.jpg

Case Study

Alexandra Security

Upgrading a wastewater pump and installation of a 3000L tank to prevent persistent flooding issues at site. 

Holiday Inn Brighton (cold water tank) (4).jpg

Case Study

Holiday Inn, Brighton

Upgrading systems with minimal disruption: we installed a new cold water storage tank without any downtime disruption.

Spa

Case Study

Bicester Hotel & Golf Spa

Submersible pump station service: take a quick tour of the key processes involved in a standard service.

Get in touch

Ready to see how we can solve your pump challenges? Get in touch with us and talk to one of our specialists.

bottom of page